Bathroom Build
Project by James - Northville, MI
Project by James - Northville, MI
This was a full bathroom build. The basement had the drain stubs in the floor already, and this was done at the time the house was built. Walls were constructed and drywall hung and finished. Tile floors, plumbing, and electrical done. Trim and final fixture installation done. The total project took around 70 hours by 1 person.
Tools / Materials
• Moen® Hilliard™ Faucet
• Moen® Hilliard™ Towel Ring
• Moen® Hilliard™ Toilet Paper Holder
• Ceramic Tile
• Grout
• Mortar
• Magick Woods Mirror
• Magick Woods Vanity Base
• Patriot Lighting® Recessed Lights
• Patriot Lighting® Somerville Light
• Cultured Marble Vanity Top
• 2 x 4 Lumber
• Basement Board Drywall
• SHEETROCK® Easy Sand™ 45 Joint Compound
• Pre-Mixed Joint Compound
• Moen® Hilliard™ Faucet
• Moen® Hilliard™ Towel Ring
• Moen® Hilliard™ Toilet Paper Holder
• Ceramic Tile
• Grout
• Mortar
• Magick Woods Mirror
• Magick Woods Vanity Base
• Patriot Lighting® Recessed Lights
• Patriot Lighting® Somerville Light
• Cultured Marble Vanity Top
• 2 x 4 Lumber
• Basement Board Drywall
• SHEETROCK® Easy Sand™ 45 Joint Compound
• Pre-Mixed Joint Compound
Loading...
Loading...