 Bathroom Build
Bathroom Build
Project by James - Northville, MI
This was a full bathroom build. The basement had the drain stubs in the floor already, and this was done at the time the house was built. Walls were constructed and drywall hung and finished. Tile floors, plumbing, and electrical done. Trim and final fixture installation done. The total project took around 70 hours by 1 person.